Why these expectations
Two tradesman-calibre painters should get 3 booth loads done every day, at a high quality. That is the standard from today.
I want to see this shop succeed, and I want to see you succeed. I'm not asking for anything I haven't done myself: Jason and I have run this shop at 3 loads a day, and 4 when we pushed.
Right now too much time goes into moving cars around, waiting on colour, wet on wet and buffing, and into not being organised, not being clean and not thinking about time management. These expectations are how we fix that.
A good day starts the day before
How you set up today decides how tomorrow goes. Before you go home:
- Know what's happening tomorrow and which car you will start on first.
- Put that car and its parts in position, so you can start straight away without moving things around.
- Do high fills in the arvo. While they dry, match colour, clean the paint room, the workshop and the booth.
- Leave your bench and the booth clean, with everything back in its spot.
When you walk in the next morning, you should be ready to go.
The daily rhythm: three loads
The first load is painted before morning tea, the second by lunch, the third before home.
- 01Load 1, before morning tea. It's usually the quickest and easiest load of the day. No morning tea until paint is going on load 1.
- 02Once paint is going on load 1, the second painter can go to morning tea, then start prepping load 2.
- 03The painter keeps painting as long as paint is going on. Finish the job, then take morning tea.
- 04Load 2, by lunch. Prepped, matched and painted together. Same logic as load 1, with lunch in place of morning tea.
- 05Load 3, before home. Same again.
- 06While the last load is being painted, prep for the high fills.
This doesn't mean you only prep high fills at the end. If there's time during the day, or it makes sense, do it. Use your head to organise your time.
Two painters, one team
When there are two of you, you tag team every load until the painter has paint in the gun.
- Prep the car together.
- One of you makes up the colour in between prep. Don't just sit on the colour match.
- Get the booth load set. If there's masking, mask up together.
- Clean the car down together.
Quality: wet on wet and rub throughs
Wet on wet has been killing us. Use it as little as possible.
- Fine to use: new bars and new panels, and where it's definitely needed for coverage and colour uniformity.
- Not fine: anywhere we can get away without it.
Rub throughs. If we're getting a lot of them, ask why.
- Repairs not good enough? They go back to the panel shop. Worst case, double high fill.
- Small rub throughs: prime them before the booth and before masking.
- We use shaded high fill to get the correct coverage. Used properly, we shouldn't need wet on wet.
Straight panels and sharp lines
Every panel must be dead straight before it's painted. That means the whole job, not just repairs: even a blend panel can be rippled.
Using the machine sander
- Use it like a block, so you don't create ripples. Long strokes, not short motions.
- Keep the sander as flat as possible. Don't dig the edge into the panel.
- No machine sanding inside reverse curves. Never dig the edge into any curve, crevice, edge, line or handle cup.
Check before you paint
- Check every panel for ripples before paint and before masking.
- When you block down a repair, wet it up with prep sol. Or when you hose the car down, check the reflection off the water.
- Not dead straight? Don't paint it.
Body lines
- Lines must look exactly the same on both sides. The repair must look the way it did before the accident.
- Sharp lines stay sharp, round lines stay round. Same for wheel arch lines when you mask up.
- On a sharp line, use masking tape to protect it and keep it extremely sharp. Never machine sand over a line and make it blunt.
Finished before it leaves paint
Cars are still reaching detailing with paint issues. Every job is finished and cleaned up before it leaves the paint shop:
- Buffing compound cleaned off.
- No overspray anywhere on the job.
- Pop spots touched up.
- Edges polished.
- Dust nibs and ghosting de-nibbed.
- Backmasked edges cleaned up.
Organised, clean, and less buffing
We make things quicker and easier by being organised.
- Clean up as you're going. No mess all over workspaces and benches.
- Keep things clean and in their spots.
- Use booth dry time: make up colours for other jobs or prep the next thing.
Buffing is far too high. It's killing time and taking it away from getting other jobs done. Less buffing comes from following the right process for a clean job, from the very start:
- Clean the job before it goes into the booth.
- Clean it again once it's in the booth.
- Blow yourself off.
- Make sure the air line is clean.
- Tack rag the job.
- Keep the job clean through every stage of paint application.
- Tack rag the blends, and tack rag the colour.
- Blow off with air.
Acceptable dust nibs per panel, no more than
- Bonnet (even a big one like a C63 bonnet): 6
- Door: 3
- Bumper: 3 to 4
When paint work is light
If there aren't 2 to 3 loads to paint, there's other work on the board, and it just has to be done: buffing, high fills, detailing, anything painters do.
Low on work doesn't mean stretching out the day. Aim to smash your work so you have nothing left, and make us find more work for you.
If the board really is clear, there's still plenty to do:
- Help the panel side, including driving cars in and fitting.
- Get jobs done around the shop and do maintenance on the booth.
- Organise paint for rims.
- Make and match colours for the next day or two of jobs.
Don't underestimate the board. It might not look like much in the morning. Drag it out and it's 2pm and you're only on job 2 of 4. Go hard from the start.
What I expect
3 loads a day at a high quality. When we're really pushing: 4 loads, or 3 loads plus a job set in the booth ready for the next morning.
That's what I expect as the boss, every day.
- V116/11/2026First version, from Dean.